Navigating the rigorous world of siteworks and large-scale infrastructure projects in Perth and throughout Western Australia, you juggle tight deadlines, challenging terrains, uncompromising safety standards, and essential sustainability protocols.

This is where our Slinger fleet, including the state-of-the-art TR20, comes in – perfectly tailored to meet these challenges, ensuring efficiency, precision, safety, and sustainability.

Backfilling • Backfilling HDPE pipe projects using PMB Slinger in Western Australia • Perth Materials Blowing

HDPE Pipe & HDPE Lining Projects

Easy backfill for pipeline trenches excavated using Vermeer trenching machines.

Safe, non-contact backfill for HDPE lining contractors requiring HDPE lining (dams, containment systems)

Servicing Gas, Water, Power utilities & Civil Constructions.

Suits projects in mining, civil infrastructure, water and desalination plants installing:

HDPE Stormater Pipe • HDPE Drainage Pipe • HDPE Tanks

Soil Cells • Backfilling soil using PMB Slinger in Western Australia • Perth Materials Blowing

Soil Cells & Grass Cell Projects

Our Slingers are designed for backfill & soil installation, helping civil engineers solve their underdrainage and WSUD challenges

• Parking Lots, Hardscaped Public Spaces, Public Transport Stations, Parks & Recreational Areas

• Road batters, medians and verges and Streetscapes

We can work with all Soil Cell & Turf Cell configurations, including Stratavault & Stratacell

Holding Tanks • Backfilling aggregates and gravel using PMB Slinger in Western Australia • Perth Materials Blowing

Fuel Tank & Holding Tank Projects

Insist on Risk Mitigation – dumping & pushing with excavators & bobcats risks strike damage to tank installations.

Our Slingers are perfect for backfilling tank installations, such as leach drain and waste holding tank jobs.

• Sewage treatment & waste water storage, petrol tank installations, stormwater management & harvesting

The speed, accuracy & safety of our slinger approach will convert you for all your future tank projects, including SPEL tank and SPEL stormwater backfills.

Low Ground Pressure • PSI Measurement • Design Icon • PMB • Perth Materials Blowing

Low Ground Pressure

Empty/loaded ground pressure: 4-7 PSI

Fast Installation • Gauge • Design Icon • PMB • Perth Materials Blowing

Fast Installation

Up to 1,000 tonnes in a single day

Proximity or Distance • Design Icon • PMB • Perth Materials Blowing

Proximity AND Distance

Install at close proximity or up to 40 metres away

The TR20 Slinger brings a new dimension to the table when it comes to tackling the multifaceted challenges of civil construction and siteworks.

Its compact and manoeuvrable design, complemented by advanced remote control features, positions it as the go-to solution for projects situated in the most challenging terrains.

Civil construction engineers, contractors and project managers know all too well the difficulties posed by off-road environments, soft ground, and sensitive environments.The TR20 is specifically designed to address these challenges. 

It boasts a low ground pressure platform that ensures minimal impact on sensitive areas while providing superior accessibility and versatility.This is particularly crucial for your work in Perth and throughout Western Australia, where diverse conditions often pose unique obstacles.

Your New Civil Engineering & Construction Problem Solver.

Be more effective.

Let our TR20 Slinger help you with:

CIVIL CONSTRUCTION

  • Energy & Power Transmission: trench backfill, siteworks, materials installation.
  • Stormwater Drainage Systems: swale materials, biofilters & rain gardens, underdrainage.
  • Utility & Cable Installation: trench backfill, including bedding sand & stabilised sand.
  • Footing Construction: foundation building, base construction, structural support formation.
  • Earthworks: stockpile relocations, materials placement, ground preparation, soil manipulation.
  • Retaining Walls: backfilling with any material, whether sand, soil or aggregates.
  • Sump Remediation: drainage improvement, runoff water management, sump system refurbishment.
  • Road Batters: slope stabilisation, embankment construction.

HARD AND SOFT LANDSCAPING

  • Hard Landscaping: structural, built environments, retaining wall backfills.
  • Soft Scaping: precise & quick installing of soil, sand and aggregates.
  • Environmental Remediation:erosion remediation and erosion control measures.
  • Megaflow Drainage Implementation: trench, piping & tank backfills.

STREETSCAPES

  • Stormwater Drainage Systems: swale materials, biofilters & rain gardens, underdrainage
  • Utility & Cable Installation: trench backfill, including bedding sand & stabilised sand

UNDERGROUND INFRASTRUCTURE

  • Stormwater Drainage Systems: swale materials, biofilters & rain gardens, underdrainage, soak wells.
  • Sewerage & Water Treatment Infrastructure: pipe & tank implementation, including bedding & surrounding backfill materials
  • Utility & Cable Installation: trench backfill, including bedding sand & stabilised sand

LAND DEVELOPMENT

  • Stormwater Drainage Systems: swale materials, biofilters, biomedia installation, rain gardens, underdrainage.
  • Retaining Walls: backfilling with any material, whether sand, soil or aggregates.
  • Road Batters: slope stabilisation, embankment construction, cut and fill works.
  • Hard Landscaping: structural, built environments, retaining wall backfills
  • Soft Scaping: precise & quick installing of mulch, soil, sand and aggregates
  • Environmental Remediation: soil remediation and erosion control measures
  • Detailed Earthworks: advanced ground modification, stockpile relocations, materials placement, ground preparation, soil manipulation
  • Megaflow Drainage Implementation: trench, piping & tank backfills

Partners and Affiliations

Re-evaluate Your Siteworks Preparation With Our Groundbreaking Slinger Services in Perth & WA

Efficiency in Site Preparation

Deliver your infrastructure projects on time and within budget, The TR20’s cost-effectiveness shines even in smaller or short-term projects.

Safety Standards

Set a new standard in site safety with reduced machinery traffic and increased precision in material distribution.

Sustainability

Make strides towards greener construction practices, reducing carbon emissions and site disruptions with our services.

Industry Recognition

Stand out as a leader in civil construction, pioneering the use of cutting-edge technology in siteworks and infrastructure development.

The TR20 Slinger shines in its ability to handle a wide range of material types, coupled with its capacity to place these materials at considerable distances.

Its completely remote-controlled operations, equipped with Frequency-Hopping Spread Spectrum (FHSS), offer a secure and constant uplink, granting total operational control at your fingertips.

This ensures efficient and effective material placement without the need for you or your team to navigate potentially hazardous environments, enhancing the safety of your site works.

TR20 Slinger: Exceptional Tracking and Manoeuverability for Your Siteworks

The TR20 Slinger’s dual-speed tracking adds a further layer of adaptability. This allows it to efficiently and safely operate in a variety of terrains, whether you’re working on an infrastructure project in the heart of Perth or conducting siteworks in the more remote areas of Western Australia.

Imagine the combination of these features easing the challenges in your siteworks, helping you complete your projects on time and within budget, while also maintaining an admirable safety record and reducing the environmental impact.

That’s the power of our TR20 Slinger.

Efficiency and Precision for Siteworks


Our new addition, the TR20 Slinger, boosts speed and accuracy in material distribution, enabling you to meet critical deadlines and overcome challenging terrains typical in siteworks.

Versatility for Different Siteworks


Our Slingers’ adaptability makes it an excellent fit for diverse site works in Perth and throughout WA, regardless of the project’s nature or scale. Management of materials on site, including stockpiles, are moved and placed hassle-free.

Wet or Dry Hire


We understand the potential learning curve when adopting new technology, which is why our own trained Slinger operators are included, allowing your team to fully harness its benefits from the get go. Dry Hire enquiries also welcomed.

Safety


By reducing the need for heavy machinery traffic in your site works, we significantly minimise the risk of accidents, contributing to the overall safety of your project.

Environmental Responsibility


With a reduced need for machinery movement, our specialised TR20 Slinger helps you maintain sustainable practices in site preparation.

The new tools of civil construction and siteworks are here.

It’s time to elevate your projects with the TR20 Slinger.

Need to know more? Get in contact with us via our form right here.

Together, let’s redefine the future of site works and civil construction and landscaping in Perth and throughout Western Australia.