The Project
Mackie Plumbing was tasked with installing a new ATU system at an aged care facility in Byford. To meet the stringent certification requirements set by the Local Government Authority (LGA), a thick layer of mulch needed to be laid across the site. With a considerable 150m³ of mulch required, Mackie Plumbing turned to PMB for a solution that could be done efficiently and without disrupting the facility’s operations.
The Challenge
Installing 150m³ of mulch is no small feat, especially when space and accessibility are limited. The project site presented two major challenges:
Large Volume of Mulch, No Room for On-Site Stockpiling – With no space available for on-site storage, bringing in and managing such a large quantity of mulch required a strategy that avoided clutter and potential delays.
Distance – The site’s layout meant that the furthest area needing coverage was approximately 100m from the nearest parking location—a significant distance to move heavy mulch by traditional means.
Our Solution
At PMB, we specialise in tackling challenging jobs like these. Here’s how we did it:
Efficient Loading and Delivery – To handle the large volume, we assigned a blower truck with a 50m³ capacity to the job. This truck allowed us to carry substantial amounts of mulch in each load, reducing the number of trips needed. We also coordinated direct reloading at our supplier, ensuring a constant flow of materials without the need for on-site stockpiling.
Long-Distance Blowing Capability – Our blower truck was up to the task of covering the long distance. Capable of blowing mulch over 100m, the truck easily reached even the furthest areas of the site. This eliminated the need for manual labour and potential damage to the facility’s existing infrastructure.
Job Done – With our experienced team and specialised equipment, the entire installation (including clean-up), was completed in just under two days.
The Result
Mackie Plumbing and the aged care facility were both delighted with the results. The mulch was installed seamlessly, meeting all certification requirements without causing any damage to the site’s existing dripline. The efficiency and professionalism of the PMB team ensured the project was completed well within the tight schedule, leaving the site clean and ready for the next phase of the facility’s development.
Professional Mulch Installation with PMB
Whether it’s a large-scale construction project or a more delicate landscaping job, PMB delivers top-notch results every time. Our team’s expertise and cutting-edge equipment make even the most challenging tasks look easy, so you can focus on what matters most.